This Project
Management tool teaches the relationships
between activities in a project. It calculates the
critical path and time for the given
network (project). Activity times and costs can be changed to
examine their effects on the project. The Crash Sequence Report is
used to display how the network could be reduced one step at a time.
 |
Item Name:
CPM Mini Sim
Item Number: F-006
Price: Free
Click on Image to
Begin.
|
The network begins with
time estimates only. The critical path and
time are shown by pressing the 'Display' button. Branch
time can be changed by using the up/down buttons by each branch in the
Input window. The 'ReSet' button clears the previous display to
allow for new inputs.
To include
crash time and cost, select the 'Crash'
option in the Input window. New time and cost entries are now
enabled. Press the 'Display' button to get the new
critical path and time calculations.
Also displayed is Crash Sequence Report.
It shows the sequence of cost and branch changes that are necessary to
get to the next lower critical time. The final entry represents
the least time the network can be crashed. |